PolarDC DRA AS
- Operator
- 1
- Projects
- 1
- Regions active in
About
Polar DC company behind the DRA campus in Drangedal, Telemark, a hydro-powered AI-ready data centre. An environmental permit for the site was granted in September 2026.
Projects
| Project | Location | Role | Status | IT power |
|---|---|---|---|---|
| Polar DRA Drangedal | Drangedal, Telemark | Operator | Partially operational | 52 MW |